Detailed explanation of the shower room acceptance installation process

First, check the goods number: address model configuration

Second, unloading the floor

Almost all shower rooms are back upstairs, and some large-sized elevators can't get in. They may also need to use cranes to hang in from the windows. So installing the master is very hard. Here, we must remind everyone that if there is no elevator on the floor, or the individual glass size and product packaging exceed the elevator load-bearing range, then the manufacturer must be notified in advance to make appropriate measures before installation. This is not a joke. The second-time service fee is for the customer to bear.

Third, unpacking inspection

Each piece of glass is individually packaged and has a clear screen-printed LOGO. Small accessories must be individually packaged to prevent loss. Acceptance cards, certificates, and maintenance instructions should be readily available.

Fourth, confirm the installation location

It must be confirmed that there is no pipeline for safe punching. (PS: especially for units with multiple toilets, the oolong event with the wrong room is not without it; it should be that there is no clear direction of the water pipe, and the water pipe is shot when the hole is punched. Consequences It is very serious. The entire wall must be opened and reinstalled.) If you use a vitrified tile, tell the business in advance to prepare a professional punching tool. And then accurately measure - mark the punch hole position - punch into the expansion bolt

Fifth, assembly

Divided into two parts, this is an installation team job. Two excellent masters cooperate with each other. Here, Master Li installs the border rails one by one to the designated position; on the other side, Lao Wang has unpacked the glass and installed pulleys and handles. .

Details: Detail 1 Use a small brush to remove the dust that was scattered when the hole was punched so that it does not get stuck in the track gap or is later sealed with "silicone" by the silicone.

Details 2 against the wall profile is best equipped with double bubble strips, the role of it is to help correct the verticality of the wall, and second, to minimize the use of silica gel. Super waterproof "bar drop"!

Master Li's border has been basically completed in accordance with the above, we look at the installation of Lao Wang master glass which have to pay attention to where it is.

The place where the glass is punched is protected by a ring-shaped cushion, because you know, the edge of the tempered glass is the most vulnerable, and the red circle of the third picture glass is a cork gasket that protects the glass during short and long distance transportation.

Shower Enclosures Unit Effect Picture Concealed Decoration Glass Unit Decoration Room Door Picture Decoration Picture Elevator Door Glass Tile Glass Door Glass Sliding Door Bathroom Door Bathroom Door Picture Bathroom Door Size Bathroom Size Bathroom Leaking Toilet Waterproof Bathroom Picture Toilet Sliding Door

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Fine Chemical

Fine Chemicals,Dyclonine Hydrochloride,Pinane Hydroperoxide,Ferrous Oxalate

Henan Tianfu Chemical Co.,Ltd , https://www.tianfuchem.com