Bathroom and kitchen waterproof construction treatment

Waterproofing of the bathroom and the kitchen is very important. It is recommended that the southern area should apply waterproof treatment to the bathroom and the kitchen at the same time.

1, first use plastic bags and the like to wrap the sewage outlets and tie them tightly to prevent clogging.

2, using the finished 851 or 911 waterproof glue first brush the wall, the ground, dry thoroughly and then brush it again. Then check if there is any micro-hole in the waterproof layer. If it is, repair it in time.

3. After brushing the second time, before it is completely dry, gently brush the surface with a thin layer of pure cement (do not use Gaza).

4, the height of the waterproof layer: It is recommended that the bathroom wall to do top, full of ground brush. The kitchen wall is 1m high, preferably to the top; the floor is full of brushes.

5 brushing, until it is dry, use a cement mortar to do a mud threshold, and then pour water in a waterproof area to test, pour water about 1cm high, time is 24 hours, no downstairs see the ceiling seepage.