Decoration Construction Tip 100 - Hydropower
1, waterproof construction should use waterproof coating 2. The waterproof project should be done after the concealed project construction is completed and accepted 3, After the completion of waterproof construction to do two water storage test 4, the bathroom waterproof layer should not be less than 1.8 meters 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof 6, floor drain to use deodorant floor drain 7, hot and cold water left hot right cold 8, try not to walk from the ground 9, cold water pipe in the wall should have a protective layer of 1CM, hot water pipe is 1.5CM, so the slot to open deep 10, PPR pipe is installed to consider the thickness of the tiles, so that the pipe will not be exposed 11, only a few minutes to cook, wash vegetables for a long time, bucket must buy big 12, leading and counter basin to support, can not be installed on the up 13, toilet installation can not use cement, use silicone 14, toilets, taps should be carefully protected after installation 15, to consider the toilet pit when buying a toilet 16, the washing machine to consider whether it is drainage or drainage 17, best not to install the bathroom phone, easy to damp 18, The mirror in the bathroom should first consider the size, otherwise the mirror headlight is very easy to install. 19, bathroom pipe is best to leave the access hole Tile toilet bathroom cement mirror headlight toilet waterproof bathroom tile bathroom size tile adhesive Barbed Wire,Razor Barbed Wire,Iron Barbed Wire Shunyuan Wire Mesh Co., Ltd. , http://www.xawiremesh.com